Getting around
Road closures in Georgetown, 2026
Where official closure news comes from, the highways through Georgetown, construction season and how to report a pothole.
Updated November 2026 · official sources and 6 highways
Check current closures near Georgetown
DriveTexas lists current closures, lane restrictions, incidents and construction on state roads, updated by the state.
Where Georgetown road closure information comes from
DriveTexas
The state's traveler information service: closures, lane restrictions, incidents, construction and, where available, cameras and winter road conditions.
Texas Department of Transportation (TxDOT)
Plans and builds the Interstates, US highways and state routes through Georgetown, including I-35, State Highway 29 and State Highway 130, and posts project and long-term closure notices.
City of Georgetown
Local street closures for public works projects, utility work, parades and special events are posted here, usually under public works or engineering news.
Highways through Georgetown
Interstates, US highways and state routes inside Georgetown city limits, longest stretch first. Most planned closures on these roads are overnight lane closures.
- I-35Interstate
- State Highway 29State route
- State Highway 130State route
- State Highway 195State route
- Spur 158State route
- Spur 26State route
Texas Department of Transportation (TxDOT) maintains these roads; most other streets in Georgetown are maintained by the City of Georgetown. Closure notices for a highway come from the state, even where it runs through the city.
How to report a pothole or road problem in Georgetown
Report an issue
Potholes, broken signals, faded striping and debris on local streets go to the City of Georgetown through this page.
Texas Department of Transportation (TxDOT)
Problems on I-35, State Highway 29, State Highway 130 and other state highways go to the state, not the city.
Call 911
For a crash, a downed power line or a hazard in a travel lane that is dangerous right now, call 911 rather than filing a report online.
Road work runs year-round in Georgetown
Normal daily highs in Georgetown stay at or above 50°F in every month, so paving and road projects can be scheduled in any season. In July and August, normal highs reach 95°F or more, and crews often move work to night and early-morning hours.
How this page is made
Highways are the Interstates, US highways and state routes inside Georgetown city limits (Census boundary) in U.S. Census Bureau TIGER/Line 2024 road data, checked against current route designations (a retired number is shown as the route that replaced it, or left out) (source), longest stretch first.
Construction season uses NOAA 1991–2020 monthly normals from the Georgetown Lake, TX station: months whose normal daily high is 50°F or more, the usual minimum for paving.
Official sources are the state road service the Georgetown getting-around page links, and the "Report an issue" link found on the local government's official homepage (georgetowntexas.gov). Checked 2026-11-17.
Road closures in Georgetown: answers
Where can I check road closures in Georgetown?
For every state road, use DriveTexas (drivetexas.org). Local street work is posted by the City of Georgetown (georgetowntexas.gov).
Which highways run through Georgetown?
I-35, State Highway 29, State Highway 130, State Highway 195, Spur 158 and Spur 26 pass through Georgetown city limits, based on Census road data. Texas Department of Transportation (TxDOT) maintains Interstates, US highways and state routes, and local streets are maintained by the City of Georgetown.
How do I report a pothole in Georgetown?
On a local street, report it to the City of Georgetown through its “Report an issue”. On I-35, State Highway 29, State Highway 130 or another state highway, report it to Texas Department of Transportation (TxDOT). For a hazard that is dangerous right now, call 911.
When is road construction season in Georgetown?
Year-round. Normal daily highs in Georgetown stay at or above 50°F in every month (NOAA 1991–2020 normals), so paving and road work can be scheduled in any season; in July and August, normal highs reach 95°F or more, when crews often shift work to cooler hours.